1
| Rheden | |
| Sector: Property maintenance and renovation | |
| Solution: Energy Boost Battery Trailer | |
| Capacity: 43 kWh | |
| Application: Electric jacks and cordless tools |
1
| De Tippe, Zwolle | |
| Sector: New-build | |
| Solution: Energy Boost Battery Trailer via Nemaco | |
| Capacity: 43 kWh | |
| Application: Construction site, site hut and cement silo | |
| Project duration: Approximately 6 months |
1
| Venue: Amerongen Castle, Utrecht | |
| Sector: Restoration and façade work | |
| Solution: Power Max Battery Trailer | |
| Capacity: 96 kWh | |
| Application: Joint-breaking hammer and equipment for high-pressure washing | |
| Project duration: Multi-year restoration and maintenance project |
1
| Location: Alkerhoornweg, Zwolle | |
| Sector: Property maintenance and renovation | |
| Solution: Battery Trailer | |
| Application: Chain park, tools and machinery | |
| Project duration: May to November inclusive | |
| Client: DeltaWonen |
1
| Sector: Residential construction | |
| Solution: Battery boxes | |
| Capacity: 53 kWh | |
| Application: Additional power can be supplied via a 3×25A building connection without the need to upgrade the mains supply | |
| Project: Kuiphuis taps |
1
| Location: Leeuwarden, Westeinde | |
| Sector: Events | |
| Solution: Battery trailer | |
| Capacity: 53 kWh | |
| Project duration: 5 days | |
| Application: Buffer on existing 3x32A connection |
1
| Location: De Noord, Heerhugowaard | |
| Sector: Events | |
| Solution: Battery trailer | |
| Capacity: 53 kWh | |
| Project duration: 5 days | |
| Application: Buffer to replace a diesel generator set |
"*" indicates required fields
"*" indicates required fields